AzTrials
AzTrials

Myocardial InfarctionCAPTURENCT01248702

A Critical Pathway for Implantable Cardioverter-Defibrillators in Patients With Ischemic Cardiomyopathy

A study testing Use of the ICD Critical Pathway in people with Myocardial Infarction and Heart Failure, run by University of British Columbia at 1 site in Canada.

Unknown status

Status not confirmed. The sponsor has not verified this record for over two years, so it may be out of date.

Official record
Search all trials

Trial summary

The purpose of this study is to develop and implement a critical pathway to identify patients with ischemic cardiomyopathy who are candidates for an implantable cardioverter-defibrillator (ICD). Read more about this study

Who is it for?
Ages 18 years and older
Conditions the study is for
Myocardial Infarction, Heart Failure
What is being tested?
Use of the ICD Critical Pathway
Could I receive a placebo?
No, everyone receives an active treatment
How many people
600 participants
Where
1 siteCanada
Study dates
Apr 2012to May 2012
Phase
Interventional
Are there results?
None posted in the registry

Key requirements

Who can take part, as listed by the sponsor. Only the study team can confirm whether you are eligible, so take this list to your doctor.

  • Ages 18 years and older
  • All sexes
  • No healthy volunteers
  • Adult, Older adult

Who may be able to join

  • acute ST segment elevation myocardial infarction (STEMI)
  • candidate for percutaneous revascularization
  • permanent residents of British Columbia, Canada

Who cannot join

  • patients with heart disease or a comorbid illness who have a documented life expectancy of less than 1 year

Trial locations and contacts

1 site in 1 country.

Canada1 site
  • St. Paul's Hospital

    Vancouver, British Columbia, V6Z 1Y6

    S Cowan, MD, MSc, (604) 682 2344, capture.study@gmail.com

    S Cowan, MD, MSc

Other trials in Canada

About this study

The purpose of this study is to develop and implement a critical pathway to identify patients with ischemic cardiomyopathy who are candidates for an implantable cardioverter-defibrillator (ICD). This study will also determine whether the use of the critical pathway for ICDs is associated with a change in the ICD referral and implantation rate.

Read the detailed description

Despite improvements in both medical management and revascularization strategies, sudden death is still a significant complication in patients with ischemic cardiomyopathy. There is strong evidence to support the role of ICDs for the primary prevention of sudden death in this population. However, in Canada and the United States, ICDs are underutilized.

Critical pathways are algorithms that improve health care delivery and clinical outcomes while reducing practice variability. The use of a critical pathway to assess a patient's eligibility for an ICD may increase the appropriate use of this evidence-based technology.

Being tested
Use of the ICD Critical Pathway
Keywords
Myocardial Infarction, Heart Failure, Sudden Cardiac Death, Critical Pathways
Medical subject headings
Myocardial Infarction, Heart Failure, Death, Sudden, Cardiac

What participants receive

What participants receive. In a randomised study each person is assigned to one group by chance.

  • Use of the ICD Critical PathwayOther

    Also called ICD Critical Pathway

    The critical pathway is a series of predetermined processes designed to assess a patient's eligibility for an ICD. The critical pathway will incorporate current evidence-based practice guidelines.

Study groups in NCT01248702
Study groupRoleWhat they receive
Critical PathwayExperimentalNot described
Receives: Other: Use of the ICD Critical Pathway
Standard PracticeNo interventionNot described

What is being measured

The primary outcome is the main question the study is designed to answer.

  1. Rate of Referral for ICD Assessment

    Measured: 1 year

Secondary outcomes (1)
  1. Rate of ICD Implantation

    Measured: 1 year

Timeline

From the start of the study to its completion; the mark is today. Estimated dates are the sponsor’s plan.

  1. First posted25 Nov 2010 (estimated)
  2. Study startApr 2012
  3. Primary completionMay 2012 (estimated)
  4. Study completionMay 2012 (estimated)

Resources

More details

For doctors and researchers: how the study is designed, who runs it, and its registry IDs.

Study design
Study type
Interventional
Phase
Phase N/A
Primary purpose
Health services research
Allocation
Non-randomised
Intervention model
Parallel groups
Masking
None (open label)
Enrolment
600 participants (estimated)
IDs, dates and publications
ClinicalTrials.gov ID
NCT01248702
Sponsor's protocol ID
H10-01537
Acronym
CAPTURE
Status last verified
Mar 2012
First submitted
22 Nov 2010
Last updated
7 Mar 2012
Results posted
No
Data monitoring committee
No

Questions about this trial

What is this clinical trial studying?

A study testing Use of the ICD Critical Pathway in people with Myocardial Infarction and Heart Failure, run by University of British Columbia at 1 site in Canada.

The full registered description is in the About this study section and the official record.

Who may be eligible to take part?

The sponsor lists 3 inclusion and 1 exclusion criteria. Eligibility is decided by the study team after screening, so read the full criteria and contact a listed site.

Is this clinical trial currently recruiting?

The record says: status not confirmed, as of the sponsor's last update on 7 Mar 2012. Status can change between updates, so confirm with the study contact before making plans.

Where is the study taking place?

The record lists 1 site in Canada. Whether a site is taking part right now should be confirmed with that site. See every site.

What are the possible benefits and risks?

They depend on the study and the treatment, and no study can promise a benefit. The study team explains the known risks during informed consent, before anyone joins; the record itself does not list them.

Are results available for this study?

Results are not available in the source record.

How can a doctor refer a patient or contact the research team?

Contact S Cowan, MD, MSc ((604) 682 2344, capture.study@gmail.com), or a site near the patient. AzTrials does not enrol participants or take referrals.

What does the primary outcome measure?

Rate of Referral for ICD Assessment (time frame: 1 year). It is what the study was designed to measure, not a finding.

Where can I read the original study information?
Does a listing mean the treatment is approved or proven to work?

No. A listing means the study is registered. It does not show that the treatment is safe, works, or is approved by a regulator.

How often is this information updated?

AzTrials copies changed records from ClinicalTrials.gov every night and reloads the whole registry every week. The sponsor last updated this record on 7 Mar 2012.

Free account

Log in to keep searching

You’ve used your 3 free searches. AzTrials is free: log in or create a free account to keep searching clinical trials and save the ones you want to follow.

Create a free accountLog in